Skip to content
Paperless inspections

Inspection app for paperless audits and site checks

Replace paper logs and binders with checks done on a phone, so every inspection gets dated, signed records with photos, exported as a PDF or spreadsheet.

  • Paper logs rebuilt as checklists your staff run on a phone
  • Readings, photos and signatures on the step they belong to
  • A failed check raises its fix, so the record shows both
  • Any completed checklist as a PDF that looks like the screen
  • Filtered records as a CSV or Excel file for the auditor

Free for your whole team. We'll only use your email to help you get set up.

Talk to us
Editing the opening checklist: a fridge check that says the display fridge should read 1 to 5 °C and, when it fails, asks for the reading in °C and what was done about it, beside a preview of the fridge check on a phone.

At a glance

Paperless inspections, in short

Fridge temperature within range, which should read 1 to 5 °C, marked Fail, and the follow-up it opened asking for the reading: 8.4 °C.

The log, without the paper

A fridge check that fails asks for the reading and what was done there and then, instead of a blank box someone fills in at the end of the week.

The corrective task a failed fridge check raised: Fix: Fridge temperature within range, still open, raised automatically from the Opening, Front of house checklist, with the question and its Fail answer.

The fix sits beside the failure

A failed answer raises a corrective task linked to the question, so an inspector sees the problem and that it was dealt with, on the same record.

The On time, late and missed report: 96.1% on time of 51 tasks that could be judged, with 49 on time, 1 late, 1 missed, none still open and none that cannot be judged.

Nothing missed without anyone noticing

Every check is due at a time. What was done on time, late or missed shows by site, so a gap is found before the inspector finds it.

Pending approvals: two end-of-day cash-ups waiting for sign-off, each with Send back and Approve.

Signed off by name

Checklists that need a manager's sign-off wait for a named reviewer, and every approval or rejection is stamped with who decided and when.

In detail

Paper records fail in predictable ways. The fridge log is filled in at the end of the week from memory. The cleaning schedule has the same initials in the same pen for a month. The page the inspector wants was in the folder that got wet. And when something did go wrong, the record shows a tick and nothing about what happened next.

Going paperless fixes the record, not just the format: checks are done on a phone, at the time, by a named person, with the evidence attached.

What going paperless replaces

  • Temperature logs for fridges, freezers, hot holding and deliveries
  • Opening and closing checks and the daily walk-round
  • Cleaning schedules pinned to the wall
  • Maintenance and fault books
  • Fire safety log books and weekly alarm tests
  • Statutory certificates and renewals that live in a drawer
  • Sign-off sheets that a manager initials once a week

Each becomes a checklist on a recurring schedule, assigned to the people on shift and marked late when it isn't done.

Records an inspector can trust

A paper tick says something happened. A digital record says what, when, and by whom:

  • Each step is timestamped, not just the form at the end, so a walk-round done in four minutes shows as four minutes
  • Readings are numbers, checked against the range they should be in
  • Photos and signatures sit on the step they relate to, and a step can refuse to be completed without one
  • Failures carry their fix: a failed answer asks what was done and can raise a corrective task that stays open until someone closes it
  • Sign-off is by name, with the reason recorded on any rejection

See compliance evidence for what makes a record hold up.

On inspection day

The inspector asks for last month's fridge records at one site. Instead of fetching a folder:

  1. Filter by site, checklist and date range on screen
  2. Download any completed checklist as a PDF that looks like the checklist on the phone: failed answers in red, photos as photos, the signature as signed, with the checklist, site and date at the top of every page
  3. Export the filtered records as a CSV or Excel file if the auditor wants the whole set

It takes minutes, and every site's records are reached from head office the same way.

Ahead of the inspection, not after it

Paper shows a gap when someone opens the folder. EasyBee shows it the day it happens. Reports show what was done on time, late or missed at every site, and can be emailed on a schedule, so a missed check is chased the same week rather than found by an inspector.

The same idea, whatever is inspected

Restaurants and cafés preparing for a food hygiene inspection, care homes, clinics, pharmacies, farms, food producers, leisure centres and schools all keep the same kind of record: a check, done at a time, by a person, with what was done when it failed. The questions differ; the record doesn't. See the guides to Safer Food, Better Business, HACCP and the food hygiene rating scheme, or how it works in hospitality and clinics.

How to make the switch

  1. Start with one record, usually the temperature log, at one site.
  2. Run paper and the app side by side for a week, then retire the paper version.
  3. Add the next record once the first runs without being chased, then roll it out to every site from the same template.

Book a set-up call and we will help you turn your existing paper forms into checklists. Talk to us.

EasyBee records that checks happened and holds the evidence. It doesn't replace your food safety plan, your risk assessments, or the rules of the scheme or regulator that inspects you.

FAQ

Paperless inspections, in practice

Do inspectors accept digital records instead of paper?
In general, yes. What inspectors and auditors look for is that records are complete, dated, made at the time, show who did the check, and show what was done when something was wrong. Digital records made on a phone at the time usually meet that better than paper filled in later. Check the specific rules of your sector or scheme if you are unsure.
How do I show records to an inspector without paper?
Search by site and date range on screen, or hand over a file. In EasyBee any completed checklist can be downloaded as a PDF that looks like the checklist itself, with photos, signatures and failed answers in red, and a filtered set of submissions can be exported as a CSV or Excel spreadsheet.
What should I move off paper first?
The records an inspector asks for first and your staff fill in most often: usually temperature logs, opening and closing checks, and cleaning schedules. They happen every day, so within a few weeks you have a complete digital history and the paper folders can be retired.

Swap the logbooks and clipboards for records an inspector can read

Set it up with your own team and see it running this week. No card required.

Free for your whole team. We'll only use your email to help you get set up.

Talk to us